Question: What is the Max thickness of wood that can be placed in the 4x8 cnc milling machine?

Current Solution

Tricky question. That depends on the way the table is built. If the table is built with a step down area, you can put as thick a material as you want. If the table is flat, the clearance is 6 inches. Now, the thickness depends on the size end mill you insert into the collet. If you use an end mill that has a 2 inch cutting length, then your material thickness is 4 inches without a spoilboard. If you need to mill thick material, I would suggest that you fashion the table accordingly so the table can accomodate any thickness you desire. That's one of the great aspects of the buildyourcnc machines, adaptability.

Respond:

Other Possible Solutions to this Question

  • I am building the CNC in your book - Build you own CNC Machine. One of the bearing thicknesses is 1/4" I can't find that bearing online. I can find 9/32, will that be a problem. Do you have a source? Thx

    As long as the bearing has a minimum thickness of 1/4" and 9/32" is a bit thicker, there will be no problem with the book build using the bearing that is 1/32" thicker. There is actually more surface area which is better.

    Click the link to add information to this solution:
    I am building the CNC in your book - Build you own CNC Machine. One of the bearing thicknesses is 1/4" I can't find that bearing online. I can find 9/32, will that be a problem. Do you have a source? Thx

  • WHAT THICKNESS OF MATERIAL CAN THE BLACKTOOTH LASER CUT?

    A standard 40W CO2 laser will cut up to 1/4" thick of material, be it wood, acrylic, card stock, leather, fabric, foam, cork, etc. (Decent speed and final cut are heavily dependent on a strong air assist upgrade)

    Metals cannot be cut due to the power level and wavelength of the CO2 laser. But it can be marked with special solutions like Cermark or Thermark.

    Click the link to add information to this solution:
    WHAT THICKNESS OF MATERIAL CAN THE BLACKTOOTH LASER CUT?

  • I am looking at the greenLean cnc machine 4'x8' Vertically Oriented CNC. I am based in the UK. What sort of shipping costs would we be looking at?

    You can determine the cost of shipping the greenLean or any other product to your country by adding the greenLean option to the cart. In the cart, click on the calculate shipping button and the shipping costs will be presented directly from the carriers that we use. You will also see the number of packages and weights of the packages in the cart, under the items in smaller print. Make sure that your shipping address is entered in the form prior to clicking on the calculate shipping button.

    Click the link to add information to this solution:
    I am looking at the greenLean cnc machine 4'x8' Vertically Oriented CNC. I am based in the UK. What sort of shipping costs would we be looking at?

  • What is your shipping costs for the greenLean CNC machine to Perth Western Australia

    You can determine if the country is serviceable by:
    - selecting the items you want to purchase on the website
    - go to the cart (shopping cart top left of any webpage)
    - log in, or register
    - Enter the address and click on calculate shipping.

    The webpage will return the direct rates and whether your area is serviced or not. Feel free to enter any address as long as you are able to receive the package from that address.

    The shipping times are determined by the service you select in the shopping cart. If a machine is purchased, we generally have a one week lead time unless otherwise stated in the description of the machine's product page.

    Additional Information:

    Click the link to add information to this solution:
    What is your shipping costs for the greenLean CNC machine to Perth Western Australia

  • Just bought Build Your own CNC Machine book. It is missing the chapter on lead screws that is described on page 181 at the end of Chaprer 16. Where can I get this info?

    It sounds like you got a misprinted book. If you purchased it from us, please contact us directly for a replacement. If you bought it from Amazon or a third party, you'll need to contact them. General information about lead screws is available on this website and at buildyourtools.com.

    Click the link to add information to this solution:
    Just bought Build Your own CNC Machine book. It is missing the chapter on lead screws that is described on page 181 at the end of Chaprer 16. Where can I get this info?

  • What size motor is powering the y axis on the greenLean CNC machine?

    For our greenLean CNC vertical machine, was built and controlled using 2 651-oz in motors/425 oz-in motor.
    The 651-oz motors runs both the x/y axis, as our 425-oz motor controls the z axis.

    Click the link to add information to this solution:
    What size motor is powering the y axis on the greenLean CNC machine?

  • USING MACH3, MY MACHINE STOPS IN THE MIDDLE OF A PROJECT. HOW CAN IT BE STARTED AGAIN FROM POINT STOPPED?

    Dealing with a mid-stop cut via Mach3, you will have to be careful if it is intentionally or unintentional. If you desire to stop your machine while in the middle of a cut be sure to stop it when the machine is moving in an upward motion on the z-axis and the X/Y-axis are stationary. Then you can choose the point (G-code) where the machine was left off and click on the Run from here button on the Program Run screen (left hand side) right above the Reset button.
    (Make sure spindle/router is running before hand!)

    Now if the machine stops unintentionally, and was moving in either the X/Y-axis, then it will be difficult to run the machine from the original point dealing with the coordinates might have been lost due the the machine continuing motion but via Mach3 the machine has stopped.

    If this occurs to fight this issue before hand, is marking your home with the spindle/router to make a hole were your home is. Although moving it manually back to home the machine can be off by the smallest amount and could cause an inconsistent cut. If accuracy is something that can not be risked, then you can home the machine about a 1/4" or 1/2" down from the original home to start your cut on the same material but loosing that small piece.

    Additional Information:


    Additional Information:
    My typical go to solution is:

    - Note the current g-code line where the machine stopped.
    - If Mach3 errored and you cannot control the machine, Exit Mach3 - you may find that reset, stop does nothing to stop the spindle. When you exit mach3, the spindle will stop automatically.
    - Restart Mach3. The DRO (Digital Readout) should show the correct coordinates where the machine position was before exiting Mach3.
    - Scroll to the g-code line where the machine stopped. You may need to go a few lines prior to make sure you are not skipping any machining operations (which is why it is a good idea to learn the basics of g-code - don't worry, it's easy)
    - Click on the "Run from Here" button.
    - Mach3 will present you with a "Preparation Move" dialog box with the location that it will move to. If the coordinates shows a position that is into the material, make sure to specify a rapid height (clearance height) so the machine will move up first and then move to the location before moving down into the material. If the spindle is automatically controlled by Mach3, make sure to check the turn spindle on checkbox. If not, make sure the router or spindle is on before clicking OK.

    Additional Information:
    My cnc router stops at gcode line 50,000 and cannot finish program. They are about 150k of lines total. I have Mach3 and have bought the additional line capability. Is 50,000 (or around that) the limit? Is Mach 4 hobby license better and in what ways? Thanks! Mike Huber

    Additional Information:
    If you have a license for Mach3, then you should be able to run g-code indefinitely. I think there is something else going on.

    Additional Information:
    Additional Information:
    If you have a license for Mach3, then you should be able to run g-code indefinitely. I think there is something else going on.
    What else could be going on?

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    41PBGevE

    Additional Information:
    -1 OR 2+358-358-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    -1' OR 2+902-902-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+902-902-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+730-730-1=0+0+0+1 or 'Qb1SuH5C'='

    Additional Information:
    -1" OR 2+161-161-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    if(now()=sysdate(),sleep(15),0)

    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    (select(0)from(select(sleep(9)))v)/*'+(select(0)from(select(sleep(9)))v)+'"+(select(0)from(select(sleep(9)))v)+"*/

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    -1; waitfor delay '0:0:15' --

    Additional Information:
    -1; waitfor delay '0:0:19' --

    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:
    -1)); waitfor delay '0:0:15' --

    Additional Information:
    1 waitfor delay '0:0:15' --

    Additional Information:
    O6enxjIS'; waitfor delay '0:0:15' --

    Additional Information:
    0MgObbnm'); waitfor delay '0:0:15' --

    Additional Information:
    8dan23Sv')); waitfor delay '0:0:15' --

    Additional Information:
    -5 OR 898=(SELECT 898 FROM PG_SLEEP(15))--

    Additional Information:
    -5 OR 353=(SELECT 353 FROM PG_SLEEP(19))--

    Additional Information:
    -5) OR 539=(SELECT 539 FROM PG_SLEEP(15))--

    Additional Information:
    -1)) OR 919=(SELECT 919 FROM PG_SLEEP(15))--

    Additional Information:
    xjpbAodW' OR 81=(SELECT 81 FROM PG_SLEEP(15))--

    Additional Information:
    r6v9pPjr') OR 551=(SELECT 551 FROM PG_SLEEP(15))--

    Additional Information:
    RDopsUKk')) OR 996=(SELECT 996 FROM PG_SLEEP(15))--

    Additional Information:

    *DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)

    Additional Information:

    '||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||'

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@HCYaP

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    USING MACH3, MY MACHINE STOPS IN THE MIDDLE OF A PROJECT. HOW CAN IT BE STARTED AGAIN FROM POINT STOPPED?

  • Hi Patrick What is the name of that organization for CNC enthusiast in Houston and Katy TX and phone number please. Thanks

    The CNC group is a splinter group of the Woodworker's Club of Houston" and can be found at this website: http://wwch.org

    You can contact them via their contact us page here: http://wwch.org/ClubBus/ContactUs.htm

    They have regular meetings at the location specified on their homepage. You can also go there and talk to some of the CNC group's members.

    Click the link to add information to this solution:
    Hi Patrick What is the name of that organization for CNC enthusiast in Houston and Katy TX and phone number please. Thanks

  • Can a CO2 CNC laser machine be used for welding of thermoplastic materials?

    That is a good question. We have not tried to weld thermoplastics using our CO2 Lasers. It is possible since the laser outputs a heat source and at the right intensity and speed, the thermoplastic can be heated and melted rather than instantaneously vaporized and off gassed. I have done research to see if CO2 laser can weld thermoplastics with positive results.

    Our CO2 lasers are typical of other laser cutters on the market, so if their literature, or examples you have found, successfully weld thermoplastics, then ours will probably be able to as well.

    In some cutting test with different speeds and intensities, the kerf has welded back together; however, this was caused by an unintentional process rather than an intentional one.

    Click the link to add information to this solution:
    Can a CO2 CNC laser machine be used for welding of thermoplastic materials?

  • What precision do the CNC machine have, for instance the 12’’ x 36’’ x 3’’?

    Our machine that matches those dimensions, the blueChick, uses roller chain for both X and Y axes, and a 1/2" 5 start 10 TPI lead screw for the Z axis. The precision is generally related to repeatability and we have not does extensive measurement of these tolerances. The resolution is set at better than 1000 steps per inch.

    Here is the link for the blueChick:
    https://www.buildyourcnc.com/blueChickVersion42CNCMachineKit.aspx

    Click the link to add information to this solution:
    What precision do the CNC machine have, for instance the 12’’ x 36’’ x 3’’?

  • IS THE CNC MACHINE HARDWARE & PLANS COMBO SHOWN AT LINK YOU LISTED SAME DESCRIBED IN BOOK?

    Yes, the CNC machine hardware and plans combo is the same machine as in the book. The machine that we provide the plans for, can be found on the website, here http://buildyourcnc.com/Item/cnc-machine-scratchbuild

    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    IS THE CNC MACHINE HARDWARE & PLANS COMBO SHOWN AT LINK YOU LISTED SAME DESCRIBED IN BOOK?

  • WHAT IS THE SHIPPING COST OF MACHINE TO AUSTRALIA?

    You can determine if the country is serviceable by:
    - selecting the items you want to purchase on the website
    - go to the cart (shopping cart top left of any webpage)
    - log in, or register
    - Enter the address and click on calculate shipping.

    The webpage will return the direct rates and whether your area is serviced or not. Feel free to enter any address as long as you are able to receive the package from that address.

    The shipping times are determined by the service you select in the shopping cart. If a machine is purchased, we generally have a one week lead time unless otherwise stated in the description of the machine's product page.

    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE SHIPPING COST OF MACHINE TO AUSTRALIA?

  • in your book - Build you own CNC Machine. Can I use 9/32" thick bearing instead of 1/4" thick?

    As long as the bearing has a minimum thickness of 1/4" and 9/32" is a bit thicker, there will be no problem with the book build using the bearing that is 1/32" thicker. There is actually more surface area which is better.

    Click the link to add information to this solution:
    in your book - Build you own CNC Machine. Can I use 9/32" thick bearing instead of 1/4" thick?

  • how can I convert the whiteAnt from the 3D printer mode to the CNC milling mode?

    To convert the whiteAnt to a CNC machine, you will want to lower the upper structure to the lowest position to create the most rigidity overall. You will see that there are many holes below the sides of the upper structure that are evenly spaced. This is so you can adjust this lower. You will also want to fasten the lower sides to a substrate (piece of wood, or something) with l-brackets or something that has a bit of adjustment capability. This will keep the sides more rigid as well. Use a Dremel for the spindle. If you want to use a another spindle, let me know and we can product a mount for that spindle since the Dremel has poor runout (TIR). This is important if you are wanting really precise milling.

    Click the link to add information to this solution:
    how can I convert the whiteAnt from the 3D printer mode to the CNC milling mode?

  • WHAT LEAD TIME CAN EXPECT FOR BLACKTOE SO PICK UP THE MACHINE?

    You can expect a one week lead time for our machines.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT LEAD TIME CAN EXPECT FOR BLACKTOE SO PICK UP THE MACHINE?

  • WHAT IS THE DIFFERENCE IN A 2.5 AXIS MACHINE?

    An axis is a direction of motion controlled by the CNC machine control. It can be linear (motion along a straight line) or circular (a rotary motion). The number of axes a machine has determines it's machining capabilities. A 2.5 axis machine really has three moving axes, but only two axes can move together (most machines sold today are full three axis machines). For machining centers, a three axis machine will have three linear axes. A four or five axis machine will have three linear axes as well as one or two rotary axes.

    Note that 2.5 versus 3 axis has yet another context. 2.5 axis machining requires that the machine have three axes, but only two axes must be moving simultaneously at any one time. (Simple operations, like drilling and most milling, fall into this category). On the other hand 3-axis machining requires that all three axes be moving at the same time (More complex operations, like the machining of sculptured surfaces required in molds and airfoils, fall into this category.)

    Additional Information:


    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE DIFFERENCE IN A 2.5 AXIS MACHINE?

  • WHAT CABLE LENGTHS SHOULD USE FOR THE BLACKFOOT CNC MACHINE

    The blackfoot requires a total of 50 feet of cable.

    The X axis needs 15 feet
    The Y axis needs 17 feet
    and the Z-axis needs 18 feet

    These are 20 gauge 4 conductor cable.

    Additional Information:

    Click the link to add information to this solution:
    WHAT CABLE LENGTHS SHOULD USE FOR THE BLACKFOOT CNC MACHINE

  • WHAT MATERIALS CAN THE GREENBULL MACHINE CUT? LASER ETCH?

    The Greenbull machine can cut a very wide variety of materials ranging from foam to aluminum. We recommend the use of our 2.2kW spindle to allow the greatest flexibility. Aside from that, the most important thing is to use an appropriate end mill for the material you are cutting and to use appropriate speeds and feed rates.



    BYCNC Response:
    Our 40W laser can cut up to about 1/4" materials ranging from wood and acrylic down through lighter materials such as leather, fabric, foam, etc. Speed and final cut are greatly enhanced by an air assist upgrade. We also offer an 80W laser which has approximately twice the capabilities of the 40W.

    Additional Information:

    Click the link to add information to this solution:
    WHAT MATERIALS CAN THE GREENBULL MACHINE CUT? LASER ETCH?

  • IF I PURCHASE A GREENBULL 6X LONG Z CNC MACHINE KIT AND MACH3, WHAT ELSE WOULD BE REQUIRED TO ASSEMBLE THE WORKING MACHINE? HAVE CAD SOFTWARE.

    You will need to build the table unit for your machine. There are instructions on how to do this at the bottom of the product page here, https://www.buildyourcnc.com/Item/cnc-machine-blackFoot-v4
    There is no estimate on how much this will cost though, since there are too many variables involved to do this.

    - PC with parallel port and USB port
    - 20awg stranded wires for the motors - http://www.buildyourcnc.com/electronicscombo.aspx
    - 18awg stranded wires for power supply to drivers
    - 24awg stranded wires for breakout board to drivers
    (location and spacing of components varies from one person to another, so we do not provide cables/wires)
    - General purpose extension cord (cut the female end off) to provide power to power supply
    - USB cable to power breakout board
    - Parallel cable to communicate to breakout board
    - Router
    - (optional - instead of router) Spindle with power inverter http://www.buildyourcnc.com/SpindlesAndAccessories.aspx
    - (if purchasing spindle with inverter) General purpose extension cord (240v) (cut the female end off) to provide power to power inverter
    - End Mill(s) http://www.buildyourcnc.com/ProductsEndMills.aspx
    - CAD, and/or CAD-CAM software (to produce geometry, machine operations, and g-code) http://www.buildyourcnc.com/CNCsoftware.aspx
    - CNC control software (to read g-code and control machine) http://www.buildyourcnc.com/CNCsoftware.aspx

    This answer is applicable to most of our machines with the exception of the greenLean and the blueChick since those machines are equipped with a table structure.

    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    IF I PURCHASE A GREENBULL 6X LONG Z CNC MACHINE KIT AND MACH3, WHAT ELSE WOULD BE REQUIRED TO ASSEMBLE THE WORKING MACHINE? HAVE CAD SOFTWARE.

Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.