[ Log In ]
[ Register ]

Question #: 574

Question: WHAT LEAD TIME CAN EXPECT FOR BLACKTOE SO PICK UP THE MACHINE?

Current Solution

You can expect a one week lead time for our machines.

Additional Information:



Additional Information:



Additional Information:



Additional Information:

Respond:

Other Possible Solutions to this Question

  • WHAT LEAD TIME CAN EXPECT FOR THE BLACKTOE MACHINE?

    You can expect a one week lead time for our machines.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT LEAD TIME CAN EXPECT FOR THE BLACKTOE MACHINE?

  • WHAT IS THE LEAD TIME FOR REDFROG PICK AND PLACE MACHINE?

    You can expect a two week lead time for the redFrog pick and place machine.

    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE LEAD TIME FOR REDFROG PICK AND PLACE MACHINE?

  • WHAT IS THE LEAD TIME FOR BLACKTOE?

    You can expect a one week lead time for our machines.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE LEAD TIME FOR BLACKTOE?

  • WHAT IS THE PICK AND PLACE LEAD TIME?

    You can expect a two week lead time for the redFrog pick and place machine.

    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE PICK AND PLACE LEAD TIME?

  • WHAT CABLE LENGTHS SHOULD USE FOR THE BLACKTOE

    The motor cables for the blackToe are as follows:

    Total 30 feet

    X - 9
    Y - 10
    Z - 11

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT CABLE LENGTHS SHOULD USE FOR THE BLACKTOE

  • WHAT CABLE LENGTHS ARE USED FOR THE BLACKTOE

    The motor cables for the blackToe are as follows:

    Total 30 feet

    X - 9
    Y - 10
    Z - 11

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT CABLE LENGTHS ARE USED FOR THE BLACKTOE

  • WHAT CABLE LENGTHS SHOULD USE FOR THE BLACKFOOT CNC MACHINE

    The blackfoot requires a total of 50 feet of cable.

    The X axis needs 15 feet
    The Y axis needs 17 feet
    and the Z-axis needs 18 feet

    These are 20 gauge 4 conductor cable.

    Additional Information:

    Click the link to add information to this solution:
    WHAT CABLE LENGTHS SHOULD USE FOR THE BLACKFOOT CNC MACHINE

  • WHAT MATERIALS CAN THE GREENBULL MACHINE CUT? LASER ETCH?

    The Greenbull machine can cut a very wide variety of materials ranging from foam to aluminum. We recommend the use of our 2.2kW spindle to allow the greatest flexibility. Aside from that, the most important thing is to use an appropriate end mill for the material you are cutting and to use appropriate speeds and feed rates.



    BYCNC Response:
    Our 40W laser can cut up to about 1/4" materials ranging from wood and acrylic down through lighter materials such as leather, fabric, foam, etc. Speed and final cut are greatly enhanced by an air assist upgrade. We also offer an 80W laser which has approximately twice the capabilities of the 40W.

    Additional Information:

    Click the link to add information to this solution:
    WHAT MATERIALS CAN THE GREENBULL MACHINE CUT? LASER ETCH?

  • WHAT ARE THE CABLE LENGTHS FOR BLACKTOE

    The motor cables for the blackToe are as follows:

    Total 30 feet

    X - 9
    Y - 10
    Z - 11

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT ARE THE CABLE LENGTHS FOR BLACKTOE

  • WHAT ARE THE CABLE LENGTHS FOR BLACKTOE

    The motor cables for the blackToe are as follows:

    Total 30 feet

    X - 9
    Y - 10
    Z - 11

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT ARE THE CABLE LENGTHS FOR BLACKTOE

  • WHAT IS THE LEAD TIME FOR BLACKFOOT

    You can expect a one week lead time for our machines.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE LEAD TIME FOR BLACKFOOT

  • WHAT IS THE LEAD TIME FOR REDFROG?

    You can expect a two week lead time for the redFrog pick and place machine.

    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE LEAD TIME FOR REDFROG?

  • DO NEED TO SQUARE UP THE MACHINE AND IF SO YOU HAVE INSTRUCTIONS OR VIDEO FOR THIS?

    The eyebolts are used in the squaring of the machine. I would use a standard carpenters square and first run the end mill along the edge of the square to first make it parallel with the long axis. Then run the end mill along the other edge with the short axis and adjust the eye bolts and chain according to the angle that the machine is out of square.

    Additional Information:

    Click the link to add information to this solution:
    DO NEED TO SQUARE UP THE MACHINE AND IF SO YOU HAVE INSTRUCTIONS OR VIDEO FOR THIS?

  • CAN I GET DXF FILES FOR THE UPDATED PARTS OF MY MACHINE?

    Yes, the customer will need to sign our NDA (Non Disclosure Agreement) form and send it back to us. We will then send the dxf of the specific updated part of the machine.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    UoZD5KPp

    Additional Information:
    -1 OR 2+416-416-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+291-291-1=0+0+0+1

    Additional Information:
    -1' OR 2+657-657-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+849-849-1=0+0+0+1 or 'WBwHf8k5'='

    Additional Information:
    -1" OR 2+276-276-1=0+0+0+1 --

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@z69Jq

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    CAN I GET DXF FILES FOR THE UPDATED PARTS OF MY MACHINE?

  • WHAT CAN ADD TO MY BLACKTOOTH LASER CUTTER MEASURE THE TIME OF USE?

    Hour meter. This will tell you exactly how long your system has been 'on' giving you a more accurate bead on the length of your tubes life.

    Click the link to add information to this solution:
    WHAT CAN ADD TO MY BLACKTOOTH LASER CUTTER MEASURE THE TIME OF USE?

  • WHAT IS THE SHIPPING COST OF MACHINE TO AUSTRALIA?

    You can determine if the country is serviceable by:
    - selecting the items you want to purchase on the website
    - go to the cart (shopping cart top left of any webpage)
    - log in, or register
    - Enter the address and click on calculate shipping.

    The webpage will return the direct rates and whether your area is serviced or not. Feel free to enter any address as long as you are able to receive the package from that address.

    The shipping times are determined by the service you select in the shopping cart. If a machine is purchased, we generally have a one week lead time unless otherwise stated in the description of the machine's product page.

    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE SHIPPING COST OF MACHINE TO AUSTRALIA?

  • HOW LONG SHOULD THE MOTOR CABLES BE FOR BLACKTOE

    The motor cables for the blackToe are as follows:

    Total 30 feet

    X - 9
    Y - 10
    Z - 11

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    HOW LONG SHOULD THE MOTOR CABLES BE FOR BLACKTOE

  • WHAT IS THE DIFFERENCE IN A 2.5 AXIS MACHINE?

    An axis is a direction of motion controlled by the CNC machine control. It can be linear (motion along a straight line) or circular (a rotary motion). The number of axes a machine has determines it's machining capabilities. A 2.5 axis machine really has three moving axes, but only two axes can move together (most machines sold today are full three axis machines). For machining centers, a three axis machine will have three linear axes. A four or five axis machine will have three linear axes as well as one or two rotary axes.

    Note that 2.5 versus 3 axis has yet another context. 2.5 axis machining requires that the machine have three axes, but only two axes must be moving simultaneously at any one time. (Simple operations, like drilling and most milling, fall into this category). On the other hand 3-axis machining requires that all three axes be moving at the same time (More complex operations, like the machining of sculptured surfaces required in molds and airfoils, fall into this category.)

    Additional Information:


    Additional Information:

    Click the link to add information to this solution:
    WHAT IS THE DIFFERENCE IN A 2.5 AXIS MACHINE?

  • AND WHAT SIZES ARE THE PACKAGES OF MACHINE.

    the package sizes will be listed in your shopping cart, in the item detail. The site will also fully calculate shipping charges directly from the carrier, for each package you purchase.

    Additional Information:

    Click the link to add information to this solution:
    AND WHAT SIZES ARE THE PACKAGES OF MACHINE.

Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.