[ Log In ]
[ Register ]
Price Options Your Cart
1/4" to 1/4" Flexible Coupling Set
$11.00

Includes free technical support.Learn More
1/4" to 3/8" Flexible Coupling Set
$11.00

Includes free technical support.Learn More
1/4" to 1/2" Flexible Coupling Set
$11.00

Includes free technical support.Learn More
1/4" to 5/8" Flexible Coupling Set
$11.00

Includes free technical support.Learn More
$11.00 - 5/16" to 1/4" Flexible Coupling Set
$11.00

Includes free technical support.Learn More
Introduction:

Flexible Coupling Sets - Connects a single motor to a lead screw end (Two Hubs and One Middle Spider)

Description:

We have an assortment of bores (shaft diameters) from which to choose. How to choose, the first measurement is one side and the second measurement is the opposite side, pretty simple. Say you have a 1/4" motor shaft, and the lead screw is 5/8", you will need a 1/4" to 5/8" coupling. Each coupling comes in three parts, two hubs and one insert.

Ask a question about the Flexible Coupling Sets - Connects a single motor to a lead screw end (Two Hubs and One Middle Spider):
Previously answered questions:

Click on the question to reveal the answer.
  • [Flexible Coupling Sets - Connects a single motor to a lead screw end (Two Hubs and One Middle Spider)] Is there extra backlash with these installed?

    Yes, there is backlash with flexible couplings. The backlash exists between the spaces of the buna spider and the hub connection. The fit is tight, but there is a bit of backlash, and over time, the buna spider can change in dimension, causing more backlash. These couplings are best used on leadscrew with a tight pitch.

    Click the link to add information to this solution:
    [41] Is there extra backlash with these installed?

--
Related Tutorials
Thumbnail: greenLean instructional image Installing the Spoilboard on the greenLean CNC Machine
Here is a tutorial on setting and permanently mounting the Spoilboard on the greenLean 4x8 Vertical CNC Machine. We recommend you use a 2nd person to help you lift and place the board. You should also mount your machine to the wall before permanently attaching the Spoilboard.
Step 36 - Software Toolchain Part 3 - The toolchain concept
At this point, you should have the control software that is described in Software Part 1 and Software Part 2. Software part 1 shows the process to install Mach3 and Software Part 2 shows the process to install a Linux control software application called EMC2. If you're still unsure what I'm talking about, then here is my detailed explanation of the entire workflow. Later posts will go into greater detail and tutorial on each program.
Laser mirror alignment Laser Mirror Alignment Tutorial for Vertical Laser XL
In this series we'll be explaining how to align the laser mirrors on your Vertical Laser XL machine. Note that these techniques can also be used for alignment on the blackTooth laser cutter and engraver.
--
Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.