Question #: 4707

Question: Can bits with shank length of 1" be used in the 1/8" ER20 collet?

Current Solution

If this endmill/bit has a shaft of 1", plus the cut length the ER-20 collets we provide will work without any issues.

If the shank goes into the 1/8" ER20-collet at least .773 (safety margin), it will work without any problems. (This is only for the 1/8" ER20-collet)

Respond:

Other Possible Solutions to this Question

  • WHAT LENGTH OF MOTOR CABLE SHOULD BE USED WTIH THE BLUECHICK V4.2

    The recommended total length of motor cable should be 15 feet for the blueChick v4.2

    Z - 6 feet
    Y - 5 feet
    X- 4 feet

    20 AWG 4 conductor

    If your drivers will be positioned farther from the machine, you may need longer cable.

    Additional Information:

    Click the link to add information to this solution:
    WHAT LENGTH OF MOTOR CABLE SHOULD BE USED WTIH THE BLUECHICK V4.2

  • WHAT SOFTWARE CAN BE USED WITH THE BLACKTOOTH LASER CUTTER?

    If you take the standard parallel cable BoB (Break Out Board), then you will need control software (Mach 3 or EMC2) and CAM software to make your G-Code (such as CamBam). Personally I use CamBam and Mach 3, they work beautifully but don't expect to turn them on and know how they work out of the box. Give yourself a few weeks to get familiar with the basics. CamBam is VERY powerful software for it's price. I'm surprised how much I keep learning on what I can do with it...I highly recommend it if you want as much control as possible.

    Mach 3 + CamBam as a bundle costs $310. EMC2 will give you a free replacement for Mach 3 and is exclusively for Linux.

    If you use the USB BoB, it will cost an extra $75 + $75 for the software. This is an all-in-one package so no need for Mach 3 or CamBam.

    For etching rasters (jpeg, bmp, tiff, non-vectors, photos), I highly recommend PicEngrave. It has been a labor of love for the past 9 years and John has done a wonderful job with it. It easily compares in quality compared to software that is in the $200-$300 range. John's software runs $40 and can be found here: http://picengrave.com/ (don't let the modest website fool you, this stuff can do amazing things). DotG and the Mach3 engrave plugin are two other options and instructions can be found on Dustans page in the gallery on buildyourcnc.com website.

    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    WHAT SOFTWARE CAN BE USED WITH THE BLACKTOOTH LASER CUTTER?

  • Is the 2.2kW spindle available in an ER20 collet option?

    the 2.2kW spindle uses the ER20 collet by default. The ER20 collets can accept shanks as small as about 1mm all the way up to 9/16 inches or 13mm.

    Click the link to add information to this solution:
    Is the 2.2kW spindle available in an ER20 collet option?

  • I just purchased the 2.2 kW water cooled spindle. I also ordered a 1/8" collet to go with it, since I assume it comes with a 1/4" collet. Is this correct?

    Spindle comes with 1/4" collet.

    "All of our spindles come standard with a 1/4" collet. The 2.2kw, and 4.0kw, can be upgraded to a 1/2" collet with a separate purchase"

    Click the link to add information to this solution:
    I just purchased the 2.2 kW water cooled spindle. I also ordered a 1/8" collet to go with it, since I assume it comes with a 1/4" collet. Is this correct?

  • wHAT IS THE SMALLEST LENGTH SHAFT I CAN USE FOR YOUR #25 DRIVE SPROCET?

    The hub length of the drive sprocket and the other mechanical devise that is used to connect on the shaft will determine the length of the shaft needed for use with the drive sprocket.

    The hub lengths for our drive sprockets are 1/2". So if you are connecting the drive sprocket to a motor, your motor shaft will need to be at least 1/2" in length.

    Click the link to add information to this solution:
    wHAT IS THE SMALLEST LENGTH SHAFT I CAN USE FOR YOUR #25 DRIVE SPROCET?

  • HOW LATE IN THE SEASON CAN I VACCINATE MY PATIENTS WITH INFLUENZA VACCINE?

    Peak influenza activity does not generally occur until February. Providers are encouraged to continue vaccinating patients throughout the influenza season, including into the spring months (e.g., through May), as long as they have vaccine in the refrigerator and unvaccinated patients in their office.

    Because influenza occurs in many areas of the world during April through September, vaccine should be given to travelers who missed vaccination in the preceding fall and winter. Another late season use of vaccine is for children younger than age 9 years who were vaccinated for the first time in the current vaccination season but failed to get their second dose. For each of these situations, vaccine can be given through the month of June since injectable influenza vaccine customarily has a June 30 expiration date.

    Click the link to add information to this solution:
    HOW LATE IN THE SEASON CAN I VACCINATE MY PATIENTS WITH INFLUENZA VACCINE?

  • CAN YOUR PRODUCTS OF MACHINES BE USED TO CREATE PLASMA TABLE?

    The plasma nozzle must be close to the cutting area and you will need some way to keep the nozzle at the right level with some type of device. The spray is downward, so you will need a contained area with a sheet of water at the bottom to extinguish he spray. You should have no problem using our machines for this application since you would need to product the table bed.

    Click the link to add information to this solution:
    CAN YOUR PRODUCTS OF MACHINES BE USED TO CREATE PLASMA TABLE?

  • HAVE PORTER CABLE 7518 ROUTER ON MY CNC AND WOULD LIKE TO KNOW IF YOUR ER20 COLLET NUT, FOR THE CABLE, WILL FIT ROUTER.

    Yes, our porter cable collets and nuts will fit the porter cable 7518.

    Additional Information:

    Click the link to add information to this solution:
    HAVE PORTER CABLE 7518 ROUTER ON MY CNC AND WOULD LIKE TO KNOW IF YOUR ER20 COLLET NUT, FOR THE CABLE, WILL FIT ROUTER.

  • LENGTH OF THE BRUSH STRIP FOR SPINDLE 2.2KW

    The total length of the brush strip for a 2.2kW spindle would be 17 1/4" inches.

    Additional Information:
    20

    Click the link to add information to this solution:
    LENGTH OF THE BRUSH STRIP FOR SPINDLE 2.2KW

  • THE CNC MACHINE IS UNSAFE WITH EXPOSED SPROCKETS THAT CAN DAMAGE FINGERS AND HAVE CLOTHING CAUGHT IN IT.

    These machines are inherently dangerous. Before the machine moves, the machine should be clear of any person by a dimension of at the distance of a persons reach plus a few more feet. This is the policies we institute in our shop and what is recommend to all of our customers. Treat these machines as you would treat any major power tool in the shop.

    With that said, you can certainly add some protective parts, but still keep folks away even with those installed. I would use the gantry side to do all of the mounting of the protective parts. Consider using sheet metal that you can bend and make a simple installation right on the gantry side.

    Additional Information:

    Click the link to add information to this solution:
    THE CNC MACHINE IS UNSAFE WITH EXPOSED SPROCKETS THAT CAN DAMAGE FINGERS AND HAVE CLOTHING CAUGHT IN IT.

  • USING MACH3, MY MACHINE STOPS IN THE MIDDLE OF A PROJECT. HOW CAN IT BE STARTED AGAIN FROM POINT STOPPED?

    Dealing with a mid-stop cut via Mach3, you will have to be careful if it is intentionally or unintentional. If you desire to stop your machine while in the middle of a cut be sure to stop it when the machine is moving in an upward motion on the z-axis and the X/Y-axis are stationary. Then you can choose the point (G-code) where the machine was left off and click on the Run from here button on the Program Run screen (left hand side) right above the Reset button.
    (Make sure spindle/router is running before hand!)

    Now if the machine stops unintentionally, and was moving in either the X/Y-axis, then it will be difficult to run the machine from the original point dealing with the coordinates might have been lost due the the machine continuing motion but via Mach3 the machine has stopped.

    If this occurs to fight this issue before hand, is marking your home with the spindle/router to make a hole were your home is. Although moving it manually back to home the machine can be off by the smallest amount and could cause an inconsistent cut. If accuracy is something that can not be risked, then you can home the machine about a 1/4" or 1/2" down from the original home to start your cut on the same material but loosing that small piece.

    Additional Information:


    Additional Information:
    My typical go to solution is:

    - Note the current g-code line where the machine stopped.
    - If Mach3 errored and you cannot control the machine, Exit Mach3 - you may find that reset, stop does nothing to stop the spindle. When you exit mach3, the spindle will stop automatically.
    - Restart Mach3. The DRO (Digital Readout) should show the correct coordinates where the machine position was before exiting Mach3.
    - Scroll to the g-code line where the machine stopped. You may need to go a few lines prior to make sure you are not skipping any machining operations (which is why it is a good idea to learn the basics of g-code - don't worry, it's easy)
    - Click on the "Run from Here" button.
    - Mach3 will present you with a "Preparation Move" dialog box with the location that it will move to. If the coordinates shows a position that is into the material, make sure to specify a rapid height (clearance height) so the machine will move up first and then move to the location before moving down into the material. If the spindle is automatically controlled by Mach3, make sure to check the turn spindle on checkbox. If not, make sure the router or spindle is on before clicking OK.

    Additional Information:
    My cnc router stops at gcode line 50,000 and cannot finish program. They are about 150k of lines total. I have Mach3 and have bought the additional line capability. Is 50,000 (or around that) the limit? Is Mach 4 hobby license better and in what ways? Thanks! Mike Huber

    Additional Information:
    If you have a license for Mach3, then you should be able to run g-code indefinitely. I think there is something else going on.

    Additional Information:
    Additional Information:
    If you have a license for Mach3, then you should be able to run g-code indefinitely. I think there is something else going on.
    What else could be going on?

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    41PBGevE

    Additional Information:
    -1 OR 2+358-358-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    -1' OR 2+902-902-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+902-902-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+730-730-1=0+0+0+1 or 'Qb1SuH5C'='

    Additional Information:
    -1" OR 2+161-161-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    if(now()=sysdate(),sleep(15),0)

    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    (select(0)from(select(sleep(9)))v)/*'+(select(0)from(select(sleep(9)))v)+'"+(select(0)from(select(sleep(9)))v)+"*/

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    -1; waitfor delay '0:0:15' --

    Additional Information:
    -1; waitfor delay '0:0:19' --

    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:
    -1)); waitfor delay '0:0:15' --

    Additional Information:
    1 waitfor delay '0:0:15' --

    Additional Information:
    O6enxjIS'; waitfor delay '0:0:15' --

    Additional Information:
    0MgObbnm'); waitfor delay '0:0:15' --

    Additional Information:
    8dan23Sv')); waitfor delay '0:0:15' --

    Additional Information:
    -5 OR 898=(SELECT 898 FROM PG_SLEEP(15))--

    Additional Information:
    -5 OR 353=(SELECT 353 FROM PG_SLEEP(19))--

    Additional Information:
    -5) OR 539=(SELECT 539 FROM PG_SLEEP(15))--

    Additional Information:
    -1)) OR 919=(SELECT 919 FROM PG_SLEEP(15))--

    Additional Information:
    xjpbAodW' OR 81=(SELECT 81 FROM PG_SLEEP(15))--

    Additional Information:
    r6v9pPjr') OR 551=(SELECT 551 FROM PG_SLEEP(15))--

    Additional Information:
    RDopsUKk')) OR 996=(SELECT 996 FROM PG_SLEEP(15))--

    Additional Information:

    *DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)

    Additional Information:

    '||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||'

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@HCYaP

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    USING MACH3, MY MACHINE STOPS IN THE MIDDLE OF A PROJECT. HOW CAN IT BE STARTED AGAIN FROM POINT STOPPED?

  • Is it possible to cut HIWIN rail to length with a hacksaw?

    t's actually pretty difficult to cut the HIWIN rail with a hacksaw since the rail is hardened. We use a cut off saw with an abrasive blade.

    Click the link to add information to this solution:
    Is it possible to cut HIWIN rail to length with a hacksaw?

  • DOES ANY OF THE SOFTWARE THAT COMES WITH IT COMPATIBLE MAC 10.6?

    There are several CAD/CAM programs out there for MacOS. Here is a list of a few: http://www.macuser.de/forum/f53/3d-2d-cad-395058/#post4499316
    I've also read good things about punchCAD: http://www.punchcad.com/
    Of course, there is always SketchUp if you are in a pinch. There are a few CAM plugins for SketchUp as well, but I've never used them, so I can't vouch for them.

    CAD/CAM will get you as far as designing your parts and producing the g-code, but if you also want to run the CNC machine with your Mac, you will need a piece of software similar to Mach3 or EMC to run the g-code. I haven't been able to find anything like these programs that runs on Mac, so you may have to run Mach3 or EMC in Windows using Boot Camp or a virtual machine such as VMware or Parallels.

    Personally, I would use the Mac to do all the CAD/CAM, then use a cheap PC to run the CNC machine.

    Additional Information:


    Additional Information:
    EasyDNC for OSX
    www.dnc-x.com

    Additional Information:


    Additional Information:
    Hi guys I’m new to the cnc and I’m beginning to learn how to operate and cad-cam software also my cnc runs on Mach3 my questions is if I should use MacBook to do all designs if I can have all this software to run on Mac or I have to use windows software to operate it? I have separate small computer connected to the cnc table who have Mach3 on it please help. Also if you know any other software much easy for beginners please let me know thank you guys!
    My email if needed is r1jastrzebski@gmail.com

    Additional Information:


    Additional Information:
    Hi , thank you for your advise!

    Additional Information:
    Hi , thank you for your advise!

    Additional Information:
    Hi , thank you for your advise!

    Additional Information:
    Hi , thank you for your advise!

    Additional Information:

    Click the link to add information to this solution:
    DOES ANY OF THE SOFTWARE THAT COMES WITH IT COMPATIBLE MAC 10.6?

  • WHAT ARE THE BLACKTOOTH LENS SIZES AND FOCAL LENGTH SPECIFICATIONS?

    The lens is 20mm wide and a 50.6mm focal length (the one included). This lens will stand up to at least 30PSI air assist.

    The mirrors are 25mm wide mirrors.

    Focal length is the distance from the lens to the material for the laser converge into the best focal point. If a lens is listed as 2". You measure 2" from the lens to the material, this will be the tightest point the laser can go before it starts to re-expand again losing focus.

    Click the link to add information to this solution:
    WHAT ARE THE BLACKTOOTH LENS SIZES AND FOCAL LENGTH SPECIFICATIONS?

  • CAN YOU GIVE ME SOME HELP OR POINT IN THE RIGHT DIRECTION TO INCORPORATE MK 7 EXTRUDER WITH BOOK PLANS FOR 3D PRINTER?

    Mounting the extruder to the whiteAnt can be done a couple of ways. One is to take the 4 mounting holes located at the lower portion of the z-axis rail support and use long screws protruding out. Take a thinner material and drill the four holes matching the locations of the 4 screws and screw on nuts to hold it in place. The other option would be to use the metal bracket and fasten to the edge of the rail support.

    Click the link to add information to this solution:
    CAN YOU GIVE ME SOME HELP OR POINT IN THE RIGHT DIRECTION TO INCORPORATE MK 7 EXTRUDER WITH BOOK PLANS FOR 3D PRINTER?

  • DO YOU SUPPLY THE MALE PORTION OF MOTOR CONTROL CABLES WITH REDLEAF?

    Yes and properly soldered.

    Additional Information:
    20

    Click the link to add information to this solution:
    DO YOU SUPPLY THE MALE PORTION OF MOTOR CONTROL CABLES WITH REDLEAF?

  • CAN THERE BE CLOSED LOOP CONTROL WITH STEPPING MOTORS?

    I haven't delved into using encoders with stepping motors too much. From my research, you need to have a controller that can provide the closed loop control, rather than software handling that process. I have also found from my research that using encoders on stepping motors is generally used to stop the machine in the case that the motor failed to achieve the commanded position for some reason and gives the user the chance to correct and continue with the job.

    If you want proper closed loop control, it may be best to go with servos and servo controller that provide the closed loop control within the real of those two components.

    Click the link to add information to this solution:
    CAN THERE BE CLOSED LOOP CONTROL WITH STEPPING MOTORS?

  • IS THE "#25 ROLLER CHAIN" ADJUSTABLE TO ANY LENGTH? LIKE IF I ORDERED TEN FEET OF IT, CAN MAKE TWO 3-FOOT LOOPS AND ONE 4-FOOT LOOP USING SOME SORT CHAIN JOINER?

    Roller chain in general is adjustable by using "master links", which are links which have horseshoe clip holding the pin and thus allow connections to be made or broken. The #25 is a designation of the type of roller chain. ANSI codes designate that the first digit(s) specify the pitch in eights of an inch, and the last digit is 0 for standard chain, 1 for lightweight chain, and 5 for bushed chain with no rollers. So #25 is 2/8 = 1/4 inch pitch bushed chain with no rollers.

    Click the link to add information to this solution:
    IS THE "#25 ROLLER CHAIN" ADJUSTABLE TO ANY LENGTH? LIKE IF I ORDERED TEN FEET OF IT, CAN MAKE TWO 3-FOOT LOOPS AND ONE 4-FOOT LOOP USING SOME SORT CHAIN JOINER?

  • CAN .7MM END MILL BE USED TO CUT THROUGH 15MM MDF?

    An end mill smaller than 1.5mm or 1/6" is too small a diameter for end mills to cut through materials that are thick. A good rule of thumb is if the end mill has a cutting length that is more than what you want to cut, that diameter will be acceptable.

    Click the link to add information to this solution:
    CAN .7MM END MILL BE USED TO CUT THROUGH 15MM MDF?

Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.