[ Log In ]
[ Register ]

Question #: 13475

Question: How many hours are required top build the 40 watt kit?

Current Solution

Assembling any of our machines will vary from customer to customer as it is a measure of the ability of the assembler. For the blackTooth laser machines, you should be able to have it assembled between two to four well focused days.

Respond:

Other Possible Solutions to this Question

  • How long does it take to build the 40 watt laser kit?

    The blackTooth Laser cutter and Engraver can be built in a weekend. Take a look at the build instructions and try to determine if you feel you have sufficient capability to put together the laser system.

    Click the link to add information to this solution:
    How long does it take to build the 40 watt laser kit?

  • What is the bill of materials included in the build your own laser 2' x 4' 40 watt

    The general bill of materials for the blackTooth 24"x20" laser system is as follows:

    - The structural components (MDO and Plastic parts)
    - The hardware to assemble all of the structural and mechanical parts
    - Mechanical parts like v-groove bearings, bearings for shafts, shafts, pulleys, belts, etc.
    - All of the motion electronics like motors, drivers, and laser controller
    - Wire to connect all of the electronics
    - All of the laser components including the laser tube, mirrors, mirror mounts, nozzle and lens
    - Pneumatic components including the air pump and tubing
    - Hydraulic components to cool the laser tube including a water pump and tubing

    blackTooth 24"x20" Laser

    Click the link to add information to this solution:
    What is the bill of materials included in the build your own laser 2' x 4' 40 watt

  • How fast can I cut 1/4" wood with the 40 watt CO2 laser?

    CO2 laser will not cut wood material fast at all. This is just the nature of the laser energy. The wood is a very low absorbent of the laser energy and you will need to run probably around 10 ipm to cut through the wood. CNC is much more efficient for cutting and laser as more efficient at marking or slowly cutting if you need the small kerf. You will also need a relatively high output air source to cut efficiently. The air will blow away the char (carbon) on the wood. The black char will absorb most of the laser energy not allowing the wood to be cut well. We use a compressor for the air source, but you can use a commercial hydroponic air pump instead.

    Click the link to add information to this solution:
    How fast can I cut 1/4" wood with the 40 watt CO2 laser?

  • HOW DIFFICULT IS IT TO BUILD THE BLACKTOOTH LASER CUTTER?

    The blackTooth Laser cutter and Engraver can be built in a weekend. Take a look at the build instructions and try to determine if you feel you have sufficient capability to put together the laser system.

    Click the link to add information to this solution:
    HOW DIFFICULT IS IT TO BUILD THE BLACKTOOTH LASER CUTTER?

  • HOW DIFFICULT IS IT TO BUILD THE BLACKTOOTH

    The blackTooth Laser cutter and Engraver can be built in a weekend. Take a look at the build instructions and try to determine if you feel you have sufficient capability to put together the laser system.

    Click the link to add information to this solution:
    HOW DIFFICULT IS IT TO BUILD THE BLACKTOOTH

  • BLACKTOE REQUIRED HOW MUCH CABLE

    The motor cables for the blackToe are as follows:

    Total 30 feet

    X - 9
    Y - 10
    Z - 11

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    BLACKTOE REQUIRED HOW MUCH CABLE

  • IF I PURCHASE A GREENBULL 6X LONG Z CNC MACHINE KIT AND MACH3, WHAT ELSE WOULD BE REQUIRED TO ASSEMBLE THE WORKING MACHINE? HAVE CAD SOFTWARE.

    You will need to build the table unit for your machine. There are instructions on how to do this at the bottom of the product page here, https://www.buildyourcnc.com/Item/cnc-machine-blackFoot-v4
    There is no estimate on how much this will cost though, since there are too many variables involved to do this.

    - PC with parallel port and USB port
    - 20awg stranded wires for the motors - http://www.buildyourcnc.com/electronicscombo.aspx
    - 18awg stranded wires for power supply to drivers
    - 24awg stranded wires for breakout board to drivers
    (location and spacing of components varies from one person to another, so we do not provide cables/wires)
    - General purpose extension cord (cut the female end off) to provide power to power supply
    - USB cable to power breakout board
    - Parallel cable to communicate to breakout board
    - Router
    - (optional - instead of router) Spindle with power inverter http://www.buildyourcnc.com/SpindlesAndAccessories.aspx
    - (if purchasing spindle with inverter) General purpose extension cord (240v) (cut the female end off) to provide power to power inverter
    - End Mill(s) http://www.buildyourcnc.com/ProductsEndMills.aspx
    - CAD, and/or CAD-CAM software (to produce geometry, machine operations, and g-code) http://www.buildyourcnc.com/CNCsoftware.aspx
    - CNC control software (to read g-code and control machine) http://www.buildyourcnc.com/CNCsoftware.aspx

    This answer is applicable to most of our machines with the exception of the greenLean and the blueChick since those machines are equipped with a table structure.

    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    IF I PURCHASE A GREENBULL 6X LONG Z CNC MACHINE KIT AND MACH3, WHAT ELSE WOULD BE REQUIRED TO ASSEMBLE THE WORKING MACHINE? HAVE CAD SOFTWARE.

  • HOW LONG WOULD IT TAKE FOR MY TO BUILD A MACHINE?

    The length of time it will take to build a CNC machine kit is not an easy answer. There may be a wide array of circumstances that limit a persons abilities to build the cnc machine kit in an efficient timeframe; however, if you have moderate dexterity and moderately mechanically inclined, you should have no problem building one of our machines within one weekend if the project has very little downtime.

    Additional Information:

    Click the link to add information to this solution:
    HOW LONG WOULD IT TAKE FOR MY TO BUILD A MACHINE?

  • THICKER MATERIAL OK TO BUILD THE MACHINE?

    Yes, it is ok if the thickness is plus or minus +/- about 2mm.

    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    THICKER MATERIAL OK TO BUILD THE MACHINE?

  • HOW MANY STEPS PER INCH DO I SET IN MOTOR TUNING?

    blueChick:

    X-axis
    “CW230 (3.0A) Driver”
    Set to 1/16 Microstep, 2.7A
    Dipswitches: 11001100
    Mach3 Motor Tuning: 1422.22 steps/in

    Y-axis
    “CW230 (3.0A) Driver”
    Set to 1/16 Microstep, 2.7A
    Dipswitches: 11001100
    Mach3 Motor Tuning: 1422.22 steps/in

    Z-axis
    “CW230 (3.0A) Driver”
    Set to 1/4 Microstep, 2.7A
    Dipswitches: 10101100
    Mach3 Motor Tuning: 1600 steps/in

    blackToe:

    X-axis
    “CW230 (3.0A) Driver”
    Set to 1/16 Microstep, 2.7A
    Dipswitches: 11001100
    Mach3 Motor Tuning: 1422.22 steps/in

    Y-axis
    “CW230 (3.0A) Driver”
    Set to 1/16 Microstep, 2.7A
    Dipswitches: 11001100
    Mach3 Motor Tuning: 1422.22 steps/in

    Z-axis
    “CW230 (3.0A) Driver”
    Set to 1/4 Microstep, 2.7A
    Dipswitches: 10101100
    Mach3 Motor Tuning: 1600 steps/in

    blackFoot:

    X-axis
    “CW8060 (6.0A) Driver”
    Set to 1/16 Microstep, 2.7A
    Dipswitches: 11001100 (“0”=down, “1”=up)
    Mach3 Motor Tuning: 914.29 steps/in

    Y-axis
    “CW230 (3.0A) Driver”
    Set to 1/16 Microstep, 2.7A
    Dipswitches: 11001100
    Mach3 Motor Tuning: 1422.22 steps/in

    Z-axis
    “CW230 (3.0A) Driver”
    Set to 1/4 Microstep, 2.7A
    Dipswitches: 10101100
    Mach3 Motor Tuning: 1600 steps/in

    greenBull:

    X-axis
    “CW8060 (6.0A) Driver”
    Set to 5.43A, 1/16 Microstep
    Dipswitches: 01100110 (“0”=down, “1”=up)
    Mach3 Motor Tuning: 914.29 steps/in

    Y-axis
    “CW8060 (6.0A) Driver”
    Set to 5.43A, 1/16 Microstep
    Dipswitches: 01100110
    Mach3 Motor Tuning: 914.29 steps/in

    Z-axis
    “CW8060 (6.0A) Driver”
    Set to 5.43A, 1/4 Microstep
    Dipswitches: 01100100
    Mach3 Motor Tuning: 1600 steps/in


    Scratch-Build / Book-Build Kit:

    X-axis
    “CW230 (3.0A) Driver”
    Set to 1/4 Microstep, 2.7A
    Dipswitches: 10101100 (“0”=down, “1”=up)
    Mach3 Motor Tuning: 1600 steps/in

    Y-axis
    “CW230 (3.0A) Driver”
    Set to 1/4 Microstep, 2.7A
    Dipswitches: 10101100
    Mach3 Motor Tuning: 1600 steps/in

    Z-axis
    “CW230 (3.0A) Driver”
    Set to 1/4 Microstep, 2.7A
    Dipswitches: 10101100
    Mach3 Motor Tuning: 1600 steps/in

    Additional Information:


    Additional Information:
    Scratch built/book CNC with NEMA 34 motors and CW8060 microstep driver

    Additional Information:


    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    L8NiICEm

    Additional Information:
    -1 OR 2+427-427-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+145-145-1=0+0+0+1

    Additional Information:
    -1' OR 2+101-101-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+739-739-1=0+0+0+1 or 'kXOzulhF'='

    Additional Information:
    -1" OR 2+194-194-1=0+0+0+1 --

    Additional Information:
    if(now()=sysdate(),sleep(15),0)

    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:



    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:



    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:



    Additional Information:
    -1; waitfor delay '0:0:15' --

    Additional Information:
    TO93cbNY

    Additional Information:
    -1 OR 2+824-824-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+681-681-1=0+0+0+1

    Additional Information:
    -1' OR 2+805-805-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+93-93-1=0+0+0+1 or 'MpFdFb3O'='

    Additional Information:
    -1" OR 2+275-275-1=0+0+0+1 --

    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:
    if(now()=sysdate(),sleep(15),0)

    Additional Information:
    -1); waitfor delay '0:0:7' --

    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:
    -1)); waitfor delay '0:0:15' --

    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:
    1 waitfor delay '0:0:15' --

    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(9),0))XOR"Z

    Additional Information:
    2k2XS4cL'; waitfor delay '0:0:15' --

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    g7NWXuig'); waitfor delay '0:0:15' --

    Additional Information:
    -1; waitfor delay '0:0:15' --

    Additional Information:
    XoN629J2')); waitfor delay '0:0:15' --

    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:
    -5 OR 247=(SELECT 247 FROM PG_SLEEP(15))--

    Additional Information:
    -1)); waitfor delay '0:0:15' --

    Additional Information:
    -5) OR 122=(SELECT 122 FROM PG_SLEEP(15))--

    Additional Information:
    1 waitfor delay '0:0:15' --

    Additional Information:
    -1)) OR 455=(SELECT 455 FROM PG_SLEEP(15))--

    Additional Information:
    o1WPxXu4'; waitfor delay '0:0:15' --

    Additional Information:
    X3pq07N4' OR 218=(SELECT 218 FROM PG_SLEEP(15))--

    Additional Information:
    i2jhQp7d'); waitfor delay '0:0:15' --

    Additional Information:
    xMv7x4te') OR 71=(SELECT 71 FROM PG_SLEEP(15))--

    Additional Information:
    IbKvmZZx')); waitfor delay '0:0:15' --

    Additional Information:
    YkhmkP9W')) OR 826=(SELECT 826 FROM PG_SLEEP(15))--

    Additional Information:
    -5 OR 539=(SELECT 539 FROM PG_SLEEP(15))--

    Additional Information:

    *DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)

    Additional Information:
    -5) OR 160=(SELECT 160 FROM PG_SLEEP(15))--

    Additional Information:

    '||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||'

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@EQr47

    Additional Information:
    -1)) OR 220=(SELECT 220 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    -1)) OR 266=(SELECT 266 FROM PG_SLEEP(9))--

    Additional Information:



    Additional Information:
    -1)) OR 107=(SELECT 107 FROM PG_SLEEP(0))--

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    vL4vUHTG' OR 262=(SELECT 262 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    gGLXRSqE' OR 938=(SELECT 938 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    WT10Ii3x' OR 598=(SELECT 598 FROM PG_SLEEP(9))--

    Additional Information:



    Additional Information:
    QUuBKFso') OR 152=(SELECT 152 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    nI56G5Pp')) OR 493=(SELECT 493 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:

    *DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)

    Additional Information:



    Additional Information:

    '||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||'

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@nxzWO

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    vJlQYk5k

    Additional Information:
    -1 OR 2+406-406-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+236-236-1=0+0+0+1

    Additional Information:
    -1' OR 2+914-914-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+282-282-1=0+0+0+1 or '9J7jHjSj'='

    Additional Information:
    -1" OR 2+210-210-1=0+0+0+1 --

    Additional Information:



    Additional Information:



    Additional Information:
    if(now()=sysdate(),sleep(15),0)

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:



    Additional Information:



    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:



    Additional Information:



    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(14),0))XOR"Z

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(0),0))XOR"Z

    Additional Information:



    Additional Information:



    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:



    Additional Information:



    Additional Information:
    -1; waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:
    -1)); waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:
    1 waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:
    RO4xZyuD'; waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:
    n2HpQRHN'); waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:
    hd4dcDEY')); waitfor delay '0:0:15' --

    Additional Information:



    Additional Information:
    -5 OR 237=(SELECT 237 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    -5) OR 65=(SELECT 65 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    -1)) OR 486=(SELECT 486 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    -1)) OR 399=(SELECT 399 FROM PG_SLEEP(14))--

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    x4ZvP74B' OR 337=(SELECT 337 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    0VRZpjOv') OR 601=(SELECT 601 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    DrCdekI1')) OR 16=(SELECT 16 FROM PG_SLEEP(15))--

    Additional Information:



    Additional Information:
    MQqu0z64')) OR 87=(SELECT 87 FROM PG_SLEEP(7))--

    Additional Information:



    Additional Information:

    *DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)

    Additional Information:



    Additional Information:

    '||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||'

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@HJ5oY

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    HOW MANY STEPS PER INCH DO I SET IN MOTOR TUNING?

  • I BOUGHT YOUR BOOK AND WAS HOPEING IT HAD PLANS OR DIMENTIONS ON HOW TO BUILD A CNC HOLD 4X8 SHEET OF PLY. WILL THE IN SCALE UP?

    BYCNC Response:
    The book build was intended to be 20 inches x 40 inches. Larger machines were designed after the book build was introduced so customers would have the option to go bigger than what the book offered. Check out our larger machines on the website as the machines sizes range from 1 foot x 3 feet all the way up to 6 feet x 12+ feet.

    User Response:
    I'm not wanting to spend $3,000+ on a machine, I want to build one that will do a 4x8 sheet of wood. Will the plans in the book scale up?

    BYCNC Response:
    It is possible to scale the book build up, but the rigidity of the gantry would be questionable at that span, even if the height of the gantry structure were to be increased. The gantry design would need to be modified to become a box shape rather than a flat configuration. The kits on the site were design for those wanting a larger machine.

    Click the link to add information to this solution:
    I BOUGHT YOUR BOOK AND WAS HOPEING IT HAD PLANS OR DIMENTIONS ON HOW TO BUILD A CNC HOLD 4X8 SHEET OF PLY. WILL THE IN SCALE UP?

  • HOW LONG FOR ME TO BUILD IT?

    The length of time it will take to build a CNC machine kit is not an easy answer. There may be a wide array of circumstances that limit a persons abilities to build the cnc machine kit in an efficient timeframe; however, if you have moderate dexterity and moderately mechanically inclined, you should have no problem building one of our machines within one weekend if the project has very little downtime.

    Additional Information:

    Click the link to add information to this solution:
    HOW LONG FOR ME TO BUILD IT?

  • THEY ARE ASKING FOR THE ACTIVATION CODE AND SERIAL NUMBER USB BOARD. HOW CAN GET THAT INFORMATION?

    To get the activation code, all you need to do is plug the USB board into the computer using a USB cable, go to machine -> firmware -> update. After the firmware is updated the program will present to you a dialog box containing the activation code.

    Additional Information:
    MUAR-QVXU-CAYW-CBWQ


    Additional Information:
    MUIS-RQPB-PTHB-QTTB

    Additional Information:
    MUIH-EERP-IADB-TRIP

    Additional Information:
    9zYWBVf5TxKSK7hEr8gFX3EBw5wa0AMMllQqgftIAnKvZ8DXItLxaPbOB3jWvnpczl/sM/De0scRPHfSxWGmcA==

    Additional Information:
    Key: LUQR-BQYI-SCEW-QVBT

    Additional Information:


    Additional Information:
    after i copy the code in the lower case i recived the same message (more than 8 times) ,, this is a evaluation...,, what i need to do to register properly?

    Additional Information:
    MUJR-BISM-KRDN-KKER
    056971

    Additional Information:
    0561234

    Additional Information:
    MURL-QPQU-EGBJ-FNMB

    Additional Information:
    MUCE-LFMQ-WBCW-MLHO

    Additional Information:


    Additional Information:
    LUTA-ADVJ-FXTW-FBCE

    Additional Information:
    LUTA-ADVJ-FXTW-FBCE

    Additional Information:
    looking for registration key for MUUK-IBTW-ECTL-CJWD

    Additional Information:
    MUXO-PIYY-KNHD-RKLY

    Additional Information:
    MUUE-YYCR-FCIC-VATK

    Additional Information:
    MUUE-YYCR-FCIC-VATK

    Additional Information:


    Additional Information:
    MUEY-YLJU-OBRR-LJBV

    Additional Information:
    MUSP-JFDV-EKGQ-OVLW

    Additional Information:
    MUSP-JFDV-EKGQ-OVLW

    Additional Information:


    Additional Information:


    Additional Information:
    MULY-XRYF-BBDN-FBWP

    Additional Information:


    Additional Information:


    Additional Information:
    how to generate activation code richauto a11

    Additional Information:
    MUJC-LNIL-EOHS-YKNQ

    Additional Information:
    sdfd

    Additional Information:
    m l

    Additional Information:
    MUXC-RWKB-PKAL-HGNN

    Additional Information:
    57625YY60Y7Y30X5

    Additional Information:
    57625YY60Y7Y30X5

    Additional Information:
    57625YY60Y7Y30X5

    Additional Information:
    57625YY60Y7Y30X5

    Click the link to add information to this solution:
    THEY ARE ASKING FOR THE ACTIVATION CODE AND SERIAL NUMBER USB BOARD. HOW CAN GET THAT INFORMATION?

  • IT OK TO USE THICKER PLYWOOD (MATERIAL) BUILD THE CNC MACHINE, BLACKFOOT, BLACKTOE?

    Yes, it is ok if the thickness is plus or minus +/- about 2mm.

    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    IT OK TO USE THICKER PLYWOOD (MATERIAL) BUILD THE CNC MACHINE, BLACKFOOT, BLACKTOE?

  • HOW COMPLEX IS YOUR KIT TO ASSEMBLE, AND MOST IMPORTANTLY - HARD IT SETUP CONTROL THE LASER WITH MACH3?

    The blackTooth Laser cutter and Engraver can be built in a weekend. Take a look at the build instructions and try to determine if you feel you have sufficient capability to put together the laser system.

    Click the link to add information to this solution:
    HOW COMPLEX IS YOUR KIT TO ASSEMBLE, AND MOST IMPORTANTLY - HARD IT SETUP CONTROL THE LASER WITH MACH3?

  • HOW SERIOUS A PROBLEM INFLUENZA (THE FLU) IN THE U.S.?

    Influenza is the most frequent cause of death from a vaccine-preventable disease in the United States. From 1990 through 1999, an average of approximately 36,000 influenza-associated pulmonary and circulatory deaths occurred during each influenza season. In addition to fatalities, seasonal influenza is also responsible for more than 200,000 hospitalizations per year. Rates of infection from seasonal influenza are highest among children, but the risks for complications, hospitalizations, and deaths are higher among adults ages 65 and older, children younger than 5 years, and people of any age who have medical conditions that place them at increased risk for complications from influenza.

    A novel H1N1 virus was first detected in March of 2009 and quickly spread to pandemic levels. In the U.S., it is estimated that approximately 43-89 million persons became ill with 2009 pandemic H1N1 from April 2009 to April 2010. The virus also resulted in significant hospitalizations and deaths among children, adults 19-65 years, obese persons, and pregnant and post-partum women.

    Click the link to add information to this solution:
    HOW SERIOUS A PROBLEM INFLUENZA (THE FLU) IN THE U.S.?

  • HOW MUCH MOTOR CABLE SHOULD PURCHASE FOR THE BLUECHICK

    The recommended total length of motor cable should be 15 feet for the blueChick v4.2

    Z - 6 feet
    Y - 5 feet
    X- 4 feet

    20 AWG 4 conductor

    If your drivers will be positioned farther from the machine, you may need longer cable.

    Additional Information:

    Click the link to add information to this solution:
    HOW MUCH MOTOR CABLE SHOULD PURCHASE FOR THE BLUECHICK

  • WHICH WIRES ARE CONNECTED TO THE EMERGENCY STOP BUTTON

    You can use one of the terminals on the input side of the breakout board to connect the e-stop switch.

    Additional Information:

    Click the link to add information to this solution:
    WHICH WIRES ARE CONNECTED TO THE EMERGENCY STOP BUTTON

  • WHAT ARE THE BEST FOODS THAT WILL HELP YOU LOSE WEIGHT?

    Lettuce, or any vegetable. Also drink a cup of water before meals, it'll make you feel fuller.

    Click the link to add information to this solution:
    WHAT ARE THE BEST FOODS THAT WILL HELP YOU LOSE WEIGHT?

Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.